PROJECT RESULTS / Annual Technical Results

Year 2 : ESDRED TECHNICAL RESULTS to January 2006

Module 1: Buffer Construction Technology for Horizontal Disposal Concepts

Summary :

During the second year of the project the various buffer materials being considered have been formulated and characterized at a sufficient level of detail. The preliminary tests and modelling, implemented to check the relevancy of material performance or emplacement technology, have delivered conclusive results, paving the way for undertaking the “Demonstrations at an industrial scale” phase. All of the design and most of the fabrication related to the industrial scale demonstrations is either complete or is ongoing. Also the Partners have agreed on the nature of the non-intrusive monitoring test programme to be run and on the location of this experiment (Mont Terri URL in Switzerland). Currently, the test equipment has been installed and a first measurement campaign has been undertaken (end of 2005).

Work completed :

Work in progress :

Important Events Planned for 2006 :