PROJECT RESULTS / Annual Technical Results

Year 2 : ESDRED TECHNICAL RESULTS to January 2006

Module 2: Waste canister Transfer and Emplacement Technology for Horizontal and Vertical Disposal Concepts

Summary :

During the second year of the project the Conceptual Design was complete for both the vertical and the horizontal emplacement concept while the Basic Design is still ongoing for the horizontal emplacement concept. In the meanttime "the Protype Testing" of a Pushing Robot for the emplacement of type C waste canisters in a horizontal disposal cell was carried out during Q4 2005 and can be considered as a technical success. The Detailed Design for the emplacement device within the vertical emplacement concept was launched in November 2005.

Work completed :

Ongoing work :

Important Events Planned for 2006 :