PROJECT RESULTS / Annual Technical Results

Year 2 : ESDRED TECHNICAL RESULTS to January 2006

Module 3 : Heavy Load Emplacement technology for Horizontal Disposal Concepts

Summary :

During the second year of the project the Detailed Design of the 3 Industrial Demonstrators was complete. The manufacturing and Factory Acceptance Test for the KBS-3H Demonstrator (water cushion technology) has been successfully finalized with CNIM at La Seyne-sur-Mer, France. The Sets of Bentonite Rings Emplacement Demonstrator and the Spent Fuel (CU1) Emplacement Demonstrator (both using air cushion technology) are in the “reception of long lead items and assembly” stage with MECACHIMIE at Beaumont-Hague, France.

Work completed :

Work Underway :

Important Events Planned for 2006 :