Year 3 : ESDRED TECHNICAL RESULTS to January 2007

Module 2: Waste canister Transfer and Emplacement Technology for Horizontal and Vertical Disposal Concepts

Summary :

During the third year of the Project the Basic Design was completed and the Detailed Design for the components of the entire emplacement system was launched, for the vertical (German) emplacement concept.
In summer 2006 a general critical review of the repository concept in argillite led to a temporary interruption of all design activities for the horizontal (French) concept. According to the new scheduling, the industrial demonstrator will be available at the end of 2008.
The retrievability desk study investigations were completed by NRG for both the vertical and the horizontal case studies. The final report will be available in spring 2007 (Year 4).

Work completed :

4. Detailed design for vertical emplacement technology
4.1. For DBE TECHNOLOGY- Detailed design for the vertical emplacement concept

- The tender process for each of the four components (emplacement device, transfer cask, transport cart, borehole lock) was successfully completed and contractors selected for performing detailed design and manufacturing.

- Contract negotiations with E-ON were completed in view of using a former turbine hall in the power station close to the city of Nienburg in the village Landesbergen for setting up a test bench.

Ongoing work :