PROJECT RESULTS / Annual Technical Results

Year 4 : ESDRED TECHNICAL RESULTS to January 2008

Module 2: Waste canister Transfer and Emplacement Technology for Horizontal and Vertical Disposal Concepts

Summary :

For the vertical concept (German) the detailed design for all components was accomplished, while the fabrication of the components and the preparation of the test stand were launched in Year 4. Specialised companies were selected and contracts for the fabrication work were awarded. The construction work at the test site (a former turbine hall of a power station in the village of Landesbergen, Federal State of Lower-Saxony) was launched. The Figures 1 to 5 display the status of the component manufacturing, whereas Figure 6 provides a view of the steel platform erected at the test site.

Following a one year delay with regard to the original planning (due to corporate strategy and not to ESDRED team inefficiency), ANDRA carried out a purchasing process, selected the appropriate Contractor to design, fabricate and test the full scale industrial demonstrator for the horizontal concept. In the course of a “Competitive Dialogue” the CEGELEC Company, based in Grenoble, acting as an industrial integrator, was chosen. The main components were designed and the most critical long lead items were also ordered. Figure 7 displays the general layout of the industrial demonstrator for the horizontal emplacement concept.

After completing the second case study, i.e. investigating the possibilities of retrieving BSK3 canisters in the German vertical borehole concept, the final deliverable (Mod2-WP4-D4) for Work Package 4 "Retrievability Desk Study" was finalised and issued in May 2007.


Figure 1: DBE TEC – Completely manufactured new transport cart


Figure 2: DBE TEC - Borehole lock in the manufacturing workshop


Figure 3: DBE TEC - Emplacement device in the manufacturing workshop


Figure 4: DBE TEC – Transfer cask in the manufacturing workshop


Figure 5: DBE TEC - Schematic view of the BSK 3-Emplacement test facility


Figure 6: DBE TEC - View onto the test platform at the test site in Landesbergen

Ongoing work:


Figure 7: Andra - general layout of the industrial demonstrator for the horizontal emplacement concept


Figure 8: ANDRA - View of the shuttle at the manufacturer's site


Figure 9: - View of the electrical winch at the manufacturer's site

Important Events Planned for 2008: